AssamBridge systemsPost-tensioning
Six-lane river crossing, balanced cantilever
Four pairs of form travellers building a variable-depth box girder across a braided river with a five-month working season.
- 160 m
- Main span
- 9.5 – 3.5 m
- Deck depth
- 8 (4 pairs)
- Travellers
- 6 days
- Segment cycle
