Project record

Delivered, measured, written down.

Every entry lists what was promised and what was actually achieved. Where the two differ, the difference is stated.

Structures delivered
340+
Deck cast
2.4 M m²
States
11
Longest span
72 m
Filter by sector

Showing 02 of 08

PLATE INTAKEMILL CERTS01PROFILINGCNC02FIT-UP± 2 mm03WELDINGISO 3834-204NDTUT · MPI · DPT05BLAST & PAINTSa 2½ · C5-M06TRIAL ASSEMBLYSURVEY vs MODEL07DESPATCHLOAD-OUT PLAN08HOLD POINT — WORK STOPS UNTIL RELEASEDMATERIAL TRACEABLE MILL CERT → ERECTED PIECE
FIG. 02Works process — plate intake to despatch, with hold points2023
Uttar PradeshSteel & fabricationBridge systems

Rail overbridge, composite plate girders

3,400 t of composite plate girders fabricated, trial assembled and erected across a live electrified rail corridor in night blocks.

3,400 t
Steel fabricated
68 m
Longest girder
14 × 4 hours
Erection blocks
EXC3
Execution class
Read the case study
08Next step

Your scheme could be the next one.

Send the general arrangement and the programme. We will tell you which of these methods applies, and what it does to your critical path.