Metro station boxes, cut and cover

Heavy girder wall formwork and 30 m shoring towers for eleven underground station boxes on a live city street.

Stations
11
Wall formwork
18,400 m²
Shoring
22,000 m³
Max lift
6.0 m
500LIFT 4 500CONCRETE PRESSUREHYDROSTATIC ρgh80 kN/m²PmaxCONSTANT BELOW SETPUSH-PULL PROPWALER @ 880 c/cWORKING PLATFORMPANEL AND TIE SPACING IS SET BY THE ENVELOPE, NOT BY THE CATALOGUEBS 5975 / EN 12812
FIG. 01Wall pour — formwork section against the concrete pressure envelopeSECTION · NTS

Scope of supply

  • Heavy girder wall formwork to 120 kN/m²
  • Ring-lock shoring to 30 m
  • Access stair towers and edge protection
  • Pour-by-pour drawings for all eleven boxes

Divisions involved

01

The problem

Eleven station boxes on the same programme, each with a different depth, wall thickness and internal layout, all being built under a decked street with a 4.2 m clear working height at deck level. Any formwork that could not be struck and moved through that gap was useless.

02

What we did

The girder formwork was configured so that no assembled unit exceeded 4.0 m in its shortest dimension, letting whole panels move through the deck openings without breaking down. Concrete pressure was calculated per pour against the actual mix and a capped placing rate, which let panel spacing open up on the lower lifts. A single drawing set covered all eleven boxes by parameterising the wall thickness.

03

What happened

Wall pours ran to a four-day cycle across all boxes. The same kit turned over between stations eleven times with one refacing operation.

Measured outcome

11
Stations
18,400 m²
Wall formwork
22,000 m³
Shoring
6.0 m
Max lift
08Next step

Send us a span table.

Give us the general arrangement and the programme. You will get two or three viable erection methods back, each with a cycle time we are prepared to stand behind — before anyone talks about price.